Resource Type

Journal Article 1028

Year

2024 2

2023 62

2022 69

2021 70

2020 44

2019 60

2018 57

2017 72

2016 30

2015 46

2014 42

2013 49

2012 38

2011 51

2010 62

2009 51

2008 48

2007 43

2006 19

2005 13

open ︾

Keywords

construction 28

process 28

ecological civilization 17

construction management 15

Three Gorges Project 13

construction technology 10

system construction 10

Anammox 7

construction industry 7

sustainable development 7

optimization 6

ship lift 6

suspension bridge 6

concrete 5

construction project 5

process intensification 5

project management 5

BIM 4

China 4

open ︾

Search scope:

排序: Display mode:

Detection of schedule delay risk of empirical construction projects

Tsegay GEBREHIWET, Hanbin LUO

Frontiers of Engineering Management 2018, Volume 5, Issue 2,   Pages 251-267 doi: 10.15302/J-FEM-2018086

Abstract: In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properlyAlthough several studies have been focused on the various effects of risk in construction projects, limitedIn this study, our aim is to detect the typical and overall schedule delay risk throughout the constructionproject lifecycle, which consists of the pre-construction, construction, and post-construction stagesfollowed integrated the multiple-criteria decision-making (MCDM) model of fuzzy analytic hierarchy process

Keywords: fuzzy analytic hierarchy process comprehensive evaluation     construction project     detection of delay risk    

Project management maturity in construction consulting services: Case of Expo in China

Yongkui LI, Qing YANG, Yan ZHANG

Frontiers of Engineering Management 2020, Volume 7, Issue 3,   Pages 384-395 doi: 10.1007/s42524-019-0070-z

Abstract: However, the adoption and investigation of PMMM in the construction field have been weak and insufficient, particularly in construction consulting services (CCS).Moreover, professionals have gradually realized the importance of non-process factors (e.g., teamworkThis study describes the construction of PMMM for CCS that considers non-process factors and combinesthem with CCS-specific process factors.

Keywords: construction consulting services     project management maturity model     non-process factors     Expo    

Research on the railway construction process quality model based on the state-space method

Lu Shoudong,Zhou Guohua,Chen Haifeng and Zhao Guotang

Strategic Study of CAE 2014, Volume 16, Issue 3,   Pages 64-69

Abstract:

In the ISO9000“input- output”process model,the concept of process quality is difficultscientific meaning of the concept of process quality and the process quality model by taking the basicoperating unit of6M1E in the railway construction project for example.Finally,the cast- in- situ prestressed concrete continuous box girder construction process is utilizedto elaborate the specific application of this theory in the quality management of the railway construction

Keywords: railway construction project     “white box”model     state transition equation     process quality    

Applying system dynamics to strategic decision making in construction

SangHyun LEE

Frontiers of Engineering Management 2017, Volume 4, Issue 1,   Pages 35-40 doi: 10.15302/J-FEM-2017002

Abstract: The author discusses the application of System Dynamics to high-level strategic simulation in constructionexercise, it is concluded that System Dynamics offers a great potential for strategic simulation in constructionframework that integrates System Dynamics and Discrete Event Simulation for a strategic decision making processin construction where operational details should be taken into account.

Keywords: strategic project management     construction management     system dynamics     feedback process     hybrid simulation    

Dynamic Visual Simulation for Concrete Dam Construction Process of the Xiangjiaba Hydro Station

Shen Mingliang,Chen Lihua,Chen Wei,Sheng Lemin,Su Junan

Strategic Study of CAE 2004, Volume 6, Issue 6,   Pages 68-73

Abstract:

In view of simulation for concrete dam construction process of the Xiangjiaba Hydro Station, the papersystemically analyses the relation and condition among various main factors during concrete dam constructionprocess.using algorithmic procedure of choosing block from separate bin, simulation result for concrete dam constructionmachine and equipment and verification of dam construction schedule.

Keywords: Xiangjiaba Hydro Station     construction simulation     concrete construction     comparison of drafts    

Research on the full life-cycle process integration model of large-scale public utility construction

Zhang Guozong,Wang Yonghua,Liu Xiong

Strategic Study of CAE 2014, Volume 16, Issue 10,   Pages 106-112

Abstract: style="text-align: justify;">The life cycle integration management of the large-scale public utility constructionprojects refers to the process integration of every stage of the project from decisions, planning, designIn this paper, in order to realize the full life-cycle target system, we studied the whole process integrationThe full life-cycle process integration model of large-scale public utility construction projects waspublic utility construction projects so that the project can achieve balance and harmony in the whole

Keywords: large-scale public utility construction project     full life cycle     process integration     support conditions    

Development and application of the real-time monitoring system for filling construction process of high

Cui Bo,Hu Lianxing,Liu Donghai

Strategic Study of CAE 2011, Volume 13, Issue 12,   Pages 91-96

Abstract: characteristics, the process control index architecture is established; the method of process monitoringin order to achieve monitoring on process of transportation to dam and rolling on dam surface.The monitoring system is applied in the construction field of the highest earth rock-fill dam in Asia, Nuozhadu core rock-fill dam, as the core component of the construction process control architectureimproves quality control level and efficiency of construction process.

Keywords: high core rock-fill dam     filling construction process     real-time monitoring     transportation to dam     rolling    

The economic impact analysis of process parameters change of large section slurry shield in urban water-rich

Wang Ying

Strategic Study of CAE 2010, Volume 12, Issue 12,   Pages 108-112

Abstract:

Taking the underground diameter shield construction of Beijing railwayfor example, the choosing principles of process parameters in different engineering geo-conditions andThe cost difference and change were analyzed according to the analysis of construction efficiency andmachine material consuming when the process parameters were adjusted.

Keywords: shield construction     process parameter     cost analysis    

GIS-based Visual Simulation Methodology for Concrete Dam Construction Process and Its Application

Li Jingru,Zhong Denghua

Strategic Study of CAE 2005, Volume 7, Issue 8,   Pages 70-74

Abstract:

This paper presents a GIS-based visual simulation methodology for concrete dam construction processGVSS has been applied to a real concrete dam construction project, which verified the feasibility of

Keywords: visual simulation     GIS     concrete dam construction     schedule     optimization    

Effect of concrete creep and shrinkage on tall hybrid-structures and its countermeasures

Pusheng SHEN, Hui FANG, Xinhong XIA

Frontiers of Structural and Civil Engineering 2009, Volume 3, Issue 2,   Pages 234-239 doi: 10.1007/s11709-009-0020-7

Abstract: This method takes into account the effects of construction process by applying loads sequentially story

Keywords: creep     shrinkage     construction process     hybrid-structure    

Whole construction process real-time schedule control and visual analysis of the long distance diversion

Hu Lianxing,Tong Dawei,Jiao Kai

Strategic Study of CAE 2011, Volume 13, Issue 12,   Pages 97-102

Abstract: The engineering quantity of each process is large, and the influence is enormous; therefore, the internaland external environment and constraint condition are changed in the actual construction, leading tothe deviation between formerly construction schedule plan and actual construction schedule plan.If the deviation isn't corrected timely, the formerly plan can not guide the actual construction.process real-time schedule control and visual analysis of the long distance diversion tunnel based on

Keywords: long diversion tunnel     construction schedule     real-time control     visual     simulation    

Research on dynamic visual simulation for construction process of river closure project based on virtual

Tong Dawei

Strategic Study of CAE 2011, Volume 13, Issue 12,   Pages 80-83

Abstract: characteristics at the closure-gap, a VR-based 3D dynamic visual-simulation of method for the complex process

Keywords: virtual reality     river closure     three-dimensional dynamic     visual simulation    

Insurance ratemaking method for risk of construction diversion project

Chen Zhiding,Hu Zhigen

Strategic Study of CAE 2011, Volume 13, Issue 4,   Pages 106-112

Abstract: And then, the standpoint that these total losses are subject to non homogeneous compound Poisson processcollective risk model of the total losses about engineering insurance is established on the basis of constructionUltimately, insurance ratemaking method for construction engineering risk and its mathematical expression

Keywords: diversion risk     engineering insurance     insurance premium     non-homogeneous compound Poisson process    

The construction methodology of knowledge discovery system framework and theoretical system

Yang Bingru

Strategic Study of CAE 2011, Volume 13, Issue 9,   Pages 83-91

Abstract: In fact, the research of process model and inner mechanism reflecting the law of knowledge discoverysystem or process and determining model and algorithm is more important, which has not got enough attentionmining system methodology and new research direction; this researches on the KD(knowledge discovery) constructionknowledge long unresolved into "the solution to these important issues such as knowledge discovery processFinally, the paper gave strong evidence of effectiveness of such construction methodology.

Keywords: double-collaborative mechanism     process model-KDD*     Maradbcm     system framework-MMAKDS     theoretical system-KDTICM    

Construction risk estimation of TBM and discussion on key risk countermeasures of Bohai Strait tunnel

Li Da,Hong Kairong and Tan Zhongsheng

Strategic Study of CAE 2013, Volume 15, Issue 12,   Pages 95-100

Abstract:

The identification and estimation of construction risks of Bohai Straittunnel are made by means of analytic hierarchy process (AHP) fuzzy comprehensive evaluation method,with the construction risks estimation of existing devised program of Bohai Strait tunnel as an exampleThe results show that the construction risk grade of Bohai Strait tunnel is grade Ⅲ.for the planning,design and construction program of sea-crossing tunnels in the future.

Keywords: Bohai Strait tunnel     analytic hierarchy process     fuzzy evaluation     risk estimation     risk countermeasure    

Title Author Date Type Operation

Detection of schedule delay risk of empirical construction projects

Tsegay GEBREHIWET, Hanbin LUO

Journal Article

Project management maturity in construction consulting services: Case of Expo in China

Yongkui LI, Qing YANG, Yan ZHANG

Journal Article

Research on the railway construction process quality model based on the state-space method

Lu Shoudong,Zhou Guohua,Chen Haifeng and Zhao Guotang

Journal Article

Applying system dynamics to strategic decision making in construction

SangHyun LEE

Journal Article

Dynamic Visual Simulation for Concrete Dam Construction Process of the Xiangjiaba Hydro Station

Shen Mingliang,Chen Lihua,Chen Wei,Sheng Lemin,Su Junan

Journal Article

Research on the full life-cycle process integration model of large-scale public utility construction

Zhang Guozong,Wang Yonghua,Liu Xiong

Journal Article

Development and application of the real-time monitoring system for filling construction process of high

Cui Bo,Hu Lianxing,Liu Donghai

Journal Article

The economic impact analysis of process parameters change of large section slurry shield in urban water-rich

Wang Ying

Journal Article

GIS-based Visual Simulation Methodology for Concrete Dam Construction Process and Its Application

Li Jingru,Zhong Denghua

Journal Article

Effect of concrete creep and shrinkage on tall hybrid-structures and its countermeasures

Pusheng SHEN, Hui FANG, Xinhong XIA

Journal Article

Whole construction process real-time schedule control and visual analysis of the long distance diversion

Hu Lianxing,Tong Dawei,Jiao Kai

Journal Article

Research on dynamic visual simulation for construction process of river closure project based on virtual

Tong Dawei

Journal Article

Insurance ratemaking method for risk of construction diversion project

Chen Zhiding,Hu Zhigen

Journal Article

The construction methodology of knowledge discovery system framework and theoretical system

Yang Bingru

Journal Article

Construction risk estimation of TBM and discussion on key risk countermeasures of Bohai Strait tunnel

Li Da,Hong Kairong and Tan Zhongsheng

Journal Article